subject
Engineering, 05.10.2019 13:00 zahid79

Aproduct whose total work content time = 50 min is assembled on a manual production line at a rate of 24 units per hour. from previous experience with similar products, it is estimated that the manning level will be close to 1.5, uptime proportion will be 0.95, and line balancing efficiency will be 0.94. if 9 sec are lost from the cycle time for repositioning, determine (a) cycle time, (b) numbers of workers and (c) stations on the line.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:20
Aheavily insulated piston-cylinder device contains 0.02 m3 of steam at 300 kpa and 200 °c. 1.2 mpa. d this process. team is now compressed in a reversible manner to a pressure of etermine the entropy change and the work done on the steam during this process
Answers: 1
You know the right answer?
Aproduct whose total work content time = 50 min is assembled on a manual production line at a rate o...
Questions
question
Mathematics, 11.05.2021 23:40
question
Mathematics, 11.05.2021 23:40