![subject](/tpl/images/cats/User.png)
Engineering, 14.09.2019 03:30 perezz97
Why should a toolpath be verified on the screen of a cam system prior to creating the program code?
![ansver](/tpl/images/cats/User.png)
Answers: 1
![](/tpl/images/ask_question.png)
![](/tpl/images/ask_question_mob.png)
Another question on Engineering
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:10
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Why should a toolpath be verified on the screen of a cam system prior to creating the program code?...
Questions
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/istoriya.png)
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 12.09.2019 03:10
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/himiya.png)
![question](/tpl/images/cats/istoriya.png)
![question](/tpl/images/cats/fizika.png)
Physics, 12.09.2019 03:10
![question](/tpl/images/cats/istoriya.png)
History, 12.09.2019 03:10
![question](/tpl/images/cats/mat.png)
Mathematics, 12.09.2019 03:10
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 12.09.2019 03:10
![question](/tpl/images/cats/es.png)
![question](/tpl/images/cats/en.png)
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/informatica.png)
Computers and Technology, 12.09.2019 03:10
![question](/tpl/images/cats/obshestvoznanie.png)
![question](/tpl/images/cats/ekonomika.png)
![question](/tpl/images/cats/ekonomika.png)