subject
Engineering, 14.09.2019 01:30 devila321

To monitor the drilling rate on an oil rig, a bottle filled with a glycol-water mixture, (sg = 1.1) is mounted on the traveling block (pulley system) which lowers the drilling pipe. flexible tubing connects the bottle to a manometer on the drilling rig floor. by measuring the pressure change with respect to time, the drilling rate can be found. if the pressure drops by 2.42 kpa per minute what is the drilling rate in m/min?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
You know the right answer?
To monitor the drilling rate on an oil rig, a bottle filled with a glycol-water mixture, (sg = 1.1)...
Questions
question
Mathematics, 31.08.2019 01:30
question
Mathematics, 31.08.2019 01:30
question
Mathematics, 31.08.2019 01:30
question
Social Studies, 31.08.2019 01:30
question
Mathematics, 31.08.2019 01:30