subject
Engineering, 13.09.2019 00:30 lauren21bunch

Consider 2 different processors p1, p2 executing the same instruction set.
p1 has a 3.27 ghz clock rate and a cpi of 1.14.
p2 has a 2.74 ghz clock rate and a cpi of 0.94.
if the processors each execute a program in 16 seconds, find the number of cycles for each processor. your answer should be in scientific notation, one non-zero digit to the left of the decimal, enough to the right to make the answer accurate, and multiplied by a power of 10. for example, 1.234 x 10^9.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 19:20
Brief discuss how the presence of dislocations in crystal structures can be an advantage and a disadvantage to engineer and designers.
Answers: 3
question
Engineering, 06.07.2019 03:10
Consider two concentric spheres forming an enclosure with diameters of 12 cm and 18 cm the spheres are maintained at uniform temperatures ti-50°c and t2 = 250°c and have emissivities .45 and .8, respectively. determine the net rate of radiation heat transfer between the two spheres per unit surface area.
Answers: 1
You know the right answer?
Consider 2 different processors p1, p2 executing the same instruction set.
p1 has a 3.27 ghz...
Questions