subject
Engineering, 07.09.2019 03:20 iibabycarrotsii

A7-station transfer line has been observed over a 40-hour period. the process times at each station are as follows: station 1, 0.80 min; station 2, 1.10 min; station 3, 1.15 min; station 4, 0.95 min; station 5, 1.06 min; station 6, 0.92 min; and station 7, 0.80 min. the transfer time between stations = 6 sec. the number of downtime occurrences = 110, and hours of downtime = 14.5 hours. a proposal has been submitted to locate a storage buffer (capacity = 20) between stations 4 and 5 to improve line efficiency. using the upper-bound approach, compute the line efficiency and production rate of the new buffer installed transfer line.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 19:10
Afoot bridge is made as a simple deck, 4 m long, with a cross section 2 m (wide) and 20 cm thick, and made of wood. the deck is supported at the two ends. the maximum load allowable on the bridge is 10 tons, provided it is uniformly distributed on the deck. to sense this load, a strain gauge is placed at the center of the bridge and its resistance is monitored. if the sensor has a nominal resistance of 350 s2 and a gauge factor of 3.6, what is the reading of the strain gauge at maximum load? the modulus of elasticity for the wood used in the construction is 10 gpa.
Answers: 2
question
Engineering, 04.07.2019 19:20
At steady state, air at 200 kpa, 325 k, and mass flow rate of 0.5 kg/s enters an insulated duct having differing inlet and exit cross-sectional areas. the inlet cross-sectional area is 6 cm2. at the duct exit, the pressure of the air is 100 kpa and the velocity is 250 m/s. neglecting potential energy effects and modeling air as an 1.008 kj/kg k, determine ideal gas with constant cp = (a) the velocity of the air at the inlet, in m/s. (b) the temperature of the air at the exit, in k. (c) the exit cross-sectional area, in cm2
Answers: 2
question
Engineering, 06.07.2019 02:30
In a unit cell of fcc structure, indicate the position of one of the tetrahedral interstitial sites by plotting the corresponding tetrahedron. do the same for one of the octahedral interstitial sites (in a separate fcc unit cell). mark the positions of all the tetrahedral and octahedral interstitial sites in the unit cells. how many equivalent tetrahedral sites and how many equivalent octahedral sites are contained in a fcc unit cell, respectively. what is the coordination number for a tetrahedral site and what is the coordination number for an octahedral site?
Answers: 2
You know the right answer?
A7-station transfer line has been observed over a 40-hour period. the process times at each station...
Questions
question
Spanish, 28.10.2020 20:50
question
Chemistry, 28.10.2020 20:50
question
Chemistry, 28.10.2020 20:50