subject
Engineering, 21.08.2019 05:20 Absynthe3986

Calculate the operational availability for a power generator with 1 scheduled maintenance per 1000 hours of operation and failure rate of 0.6 failures per 1000 hours. preventive maintenance takes on average 8 hours, however if the engine fails, it typically takes 26 hours to repair it. logistics and administrative delays typically add extra 12 hours to the maintenance time.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 19:20
Determine the stoichiometric and actual air-fuel ratios and the mole flue gas composition for combustion with 15% excess air for raw indiana, pennsylvania raw coal.
Answers: 3
You know the right answer?
Calculate the operational availability for a power generator with 1 scheduled maintenance per 1000 h...
Questions
question
Mathematics, 23.01.2020 18:31
question
Mathematics, 23.01.2020 18:31
question
Mathematics, 23.01.2020 18:31
question
Mathematics, 23.01.2020 18:31