subject
Engineering, 07.08.2019 18:30 sustaitaj2022

In a 3x3m square flat horizontal solar collector the outside of the glass cover of the collector is at 40 c and the ambient air is at 10 c with wind parallel to the surface of the collector at velocity of 10m/s. find: a. the rate of heat loss by convection from the glass b. the friction coefficient, cf on the glass c. if the wind dies down find the rate of heat transfer from the glass assuming its outside temperature remains the same.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
In a 3x3m square flat horizontal solar collector the outside of the glass cover of the collector is...
Questions
question
History, 20.01.2021 22:40
question
Mathematics, 20.01.2021 22:40
question
Computers and Technology, 20.01.2021 22:40
question
Mathematics, 20.01.2021 22:40
question
Mathematics, 20.01.2021 22:40