subject

Create an abstract class PayCalculator that has an attribute payRate given in dollars per hour. The class should also have a method computePay(hours) that returns the pay for a given amount of time. Derive a class RegularPay from PayCalculator, as described above. It should have a constructor that has a parameter for the pay rate. It should not override any of the methods. Then derive a class HazardPay from PayCalculator that overrides the computePay method. The new method should return the amount returned by the base class method multiplied by 1.5.
Grading Rubric
Task
Points
Working solution for the problem 5
Best practices in programming 1
Total 6

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 02:30
Write a program that takes in 3 inputs [players (int type), expected game time (double type), team (char type)] and calculates actual game time (double) based on the following conditions: if the number of players or the expected game time is less than or equal to zero, it should output wrong input if the number of players is greater than 0 and less than or equal to 6 and if they are on the â€r’ or â€r’ team, their game time will be 10% faster. and if they are on the â€b’ or â€b’ team, their game time will be 15% faster. and if they are on the â€y’ or â€y’ team, their game time will be 20% faster. and if they are on any other team, they will play 0% faster. if the number of players is greater than 6 but less than or equal to 12 and if they are on the â€r’ or â€r’ team, their game time will be 20% faster. and if they are on the â€b’ or â€b’ team, their game time will be 25% faster. and if they are on the â€y’ or â€y’ team their game time will be 30% faster. and if they are on any other team, they will play 0% faster. if the number of players is greater than 12 but less than or equal to 18 and if they are on the â€r’ or â€r’ team, their game time will be 30% faster. and if they are on the â€b’ or â€b’ team, their game time will be 35% faster. and if they are on the â€y’ or â€y’ team, their game time will
Answers: 2
question
Computers and Technology, 23.06.2019 03:10
Acomputer has a two-level cache. suppose that 60% of the memory references hit on the first level cache, 35% hit on the second level, and 5% miss. the access times are 5 nsec, 15 nsec, and 60 nsec, respectively, where the times for the level 2 cache and memory start counting at the moment it is known that they are needed (e.g., a level 2 cache access does not even start until the level 1 cache miss occurs). what is the average access time?
Answers: 1
question
Computers and Technology, 23.06.2019 11:30
The most accurate readings that you can take on an analog vom are when the meter's pointer is at the a. center scale. b. extreme right. c. near right. d. extreme left.
Answers: 1
question
Computers and Technology, 24.06.2019 12:40
Match the feature to the network architecture. expensive to set up useful for a small organization easy to track files has a central server inexpensive to set up difficult to track files useful for a large organization does not have a central server client- server network peer-to-peer network
Answers: 3
You know the right answer?
Create an abstract class PayCalculator that has an attribute payRate given in dollars per hour. The...
Questions
question
Mathematics, 22.01.2022 15:00
question
Mathematics, 22.01.2022 15:00
question
French, 22.01.2022 15:00
question
Mathematics, 22.01.2022 15:00
question
Mathematics, 22.01.2022 15:00