A production manager wants to determine how many units of each product to produce weekly to maximize weekly profits. Production requirements for the products are shown in the following table.
Product Material 1 (lbs.) Material 2 (lbs.) Labor (hours)
A 3 2 4
B 1 4 2
C 5 none 3.5
Material 1 costs $7 a pound, material 2 costs $5 a pound, and labor costs $15 per hour. Product A sells for $101 a unit, product B sells for $67 a unit, and product C sells for $97.50 a unit. Each week there are 300 pounds of material 1; 400 pounds of material 2; and 200 hours of labor. Also, there is a weekly demand of at least 10 units of product C each week.
Formulate the given problem scenario as a linear program, and solve the problem using Microsoft Excel Solver. For the formulation, provide a complete description of the decision variables used along with their units and also label the constraints mentioned in the problem as completely as possible. Also, the Excel set-up should provide clearly labeled values used for the decision variables, constraints, and objective function.
Answers: 2
Computers and Technology, 22.06.2019 21:30
This graph compares the total cost of attending educational institutions in texas. the graph demonstrates that the cost at private and public technical schools greatly varies.
Answers: 2
Computers and Technology, 23.06.2019 22:30
Lakendra finished working on her monthly report. in looking it over, she saw that it had large blocks of white space. what steps could lakendra take to reduce the amount of white space?
Answers: 3
Computers and Technology, 24.06.2019 09:00
Why might you chose to crest a function resume
Answers: 1
Computers and Technology, 24.06.2019 17:00
The length of time that a slide appears before automatically advancing to the next slide can be set in the timing group under the transitions tab. transition to this slide group under the transitions tab. timing group in the master slide view. transition to this slide group in the master slide view.
Answers: 1
A production manager wants to determine how many units of each product to produce weekly to maximize...
English, 06.05.2020 01:32
Mathematics, 06.05.2020 01:32
Mathematics, 06.05.2020 01:33
Mathematics, 06.05.2020 01:33