subject
Computers and Technology, 04.05.2021 04:10 nan487

On the Direct Marketing worksheet, create appropriate range names for Design Fee (cell B8), Cost Per Ad (cell B9), Total Clicks (cell B10), Profit Per Click (B11), and Gross Profit (cell B12).

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 23.06.2019 18:00
Freya realizes she does not have enough in her bank account to use the debit card. she decides to use a credit card instead. which questions should freya answer before using a credit card? check all that apply. can i pay at least the minimum payment each month? can i make payments on time and avoid late fees? will i have to take out a loan? how much in finance charges can i afford to pay? should i talk to a consumer credit counseling service?
Answers: 1
question
Computers and Technology, 23.06.2019 19:00
Now you’re on your own. include a short summary of this section with plots in your lab report. write a matlab script file to do steps (a) through (d) below. include a listing of the script file with your report. 1 the soundsc(xx,fs) function requires two arguments: the first one (xx) contains the vector of data to be played, the second argument (fs) is the sampling rate for playing the samples. in addition, soundsc(xx,fs) does automatic scaling and then calls sound(xx,fs) to actually play the signal. mcclellan, schafer, and yoder, dsp first, 2e, isbn 0-13-065562-7. prentice hall, upper saddle river, nj 07458. c 2015 pearson education, inc. 4 mcclellan, schafer and yoder, signal processing first. prentice hall, upper saddle river, new jersey, 2003. c 2003 prentice hall. (a) generate a time vector (tt) to cover a range of t that will exhibit approximately two cycles of the 4000 hz sinusoids defined in the next part, part (b). use a definition for tt similar to part 2.2(d). if we use t to denote the period of the sinusoids, define the starting time of the vector tt to be equal to t , and the ending time as ct . then the two cycles will include t d 0. finally, make sure that you have at least 25 samples per period of the sinusoidal wave. in other words, when you use the colon operator to define the time vector, make the increment small enough to generate 25 samples per period. (b) generate two 4000 hz sinusoids with arbitrary amplitude and time-shift. x1.t / d a1 cos.2
Answers: 1
question
Computers and Technology, 24.06.2019 08:20
Which type of entity describes a fundamental business aspect of a database? a. linking b. lookup c. domain d. weak
Answers: 3
question
Computers and Technology, 24.06.2019 08:30
Why might you choose to create a functional resume
Answers: 1
You know the right answer?
On the Direct Marketing worksheet, create appropriate range names for Design Fee (cell B8), Cost Per...
Questions