subject

An application requires that at least 2 processors in a multi-processor system be available with more than 95% probability. The cost of a processor with 60% availability is $10000 and each increase of 10% (0.1) in the availability will cost $8000. To constrain the problem, assume that the availability of each component increases in steps of 0.1 and never exceeds 0.90. Determine the number of processors (n) and availability (A) of each processor that minimizes the total system cost. Assume that all the processors in the system have the same availability.

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 23.06.2019 03:50
Iam a bacterium. i cause stomach cramps and diarrhea. i am caused by eating rotten foodssuch as chicken, fish, or eggs. sometimes turtles carry my bacteria.what am i?
Answers: 2
question
Computers and Technology, 23.06.2019 14:30
The basic work area of the computer is it screen that you when you first fire up your computer
Answers: 1
question
Computers and Technology, 24.06.2019 04:30
Fall protection, confined space entry procedures, controlled noise levels, and protection from chemical hazards are some of the things that contribute to a safe what
Answers: 1
question
Computers and Technology, 24.06.2019 15:30
How do i change the size of my bookmarks in my bookmarks bar in google chrome? ? plz hlp me
Answers: 2
You know the right answer?
An application requires that at least 2 processors in a multi-processor system be available with mor...
Questions
question
Mathematics, 20.04.2020 16:58
question
Mathematics, 20.04.2020 16:58
question
Arts, 20.04.2020 16:58
question
Mathematics, 20.04.2020 16:58