subject

An operator walks from his workstation to a set of shelves 5 steps (~15 feet) away. With his right hand, he easily picks up a small part weighing 2.5 pounds from among various other objects on a shelf, which is at ankle level. (Assume the operator is standing directly adjacent to the shelf and the length of reach is 22 inches). He returns to his workstation and places (with care) the part on the work surface, which is at waist height. a. (10 points) Develop a general move MOST sequence model to describe this activity (referencing MOST tables). Calculate the estimated standard time in both TMUs and seconds for this activity. State any assumptions you make.

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 23.06.2019 12:40
Curriculum exam to process a resident's payment, you must click on onesite payments home page. from the a. reports b. my settings o c.transactions o d. rent tab
Answers: 1
question
Computers and Technology, 23.06.2019 14:30
Select the correct answer. andy received a potentially infected email that was advertising products. andy is at risk of which type of security threat? a. spoofing b. sniffing c. spamming d. phishing e. typo-squatting
Answers: 2
question
Computers and Technology, 24.06.2019 12:00
What is a sketch or blueprint of a web page that shows the structure (but not the detailed design) of basic page elements such as the logo, navigation, content, and footer?
Answers: 3
question
Computers and Technology, 24.06.2019 13:30
Which type of excel chart should be used to track students’ progress on test grades? line column bar pie
Answers: 2
You know the right answer?
An operator walks from his workstation to a set of shelves 5 steps (~15 feet) away. With his right h...
Questions
question
English, 25.02.2021 21:50
question
Mathematics, 25.02.2021 21:50
question
Mathematics, 25.02.2021 21:50
question
Mathematics, 25.02.2021 21:50