Computers and Technology, 12.02.2021 07:30 loganharper992
Your team at amazon is overseeing the design of a new high-efficiency data center at HQ2. A power grid need to be generated for supplying power to N servers. All servers in the grid have to be connected such that they have access to power. The cost of connections between different servers varies. Assume that there are no ties, names of servers are unique, connections are directionless, there is at most one connection between a pair of servers, all costs are greater than zero, and a server does not connect to itself. Write an algorithm to minimize the cost of connecting all servers in the power grid. Input two arguments - num, an Integer representing number of connections. connectons, representing a list of connections where each element of the list consists of two servers and the cost of connection between the servers. Note The cost of connection between the servers is always greater than 0.
Answers: 3
Computers and Technology, 22.06.2019 12:40
How do i get the most points, without any effort?
Answers: 2
Computers and Technology, 22.06.2019 13:30
In which phase does software coding and testing happen in the spiral model? the spiral model does not have a separate testing phase. both, software coding and testing occurs during the phase.
Answers: 3
Computers and Technology, 22.06.2019 15:30
Whats are the different parts of no verbal comunication, especially body language?
Answers: 3
Computers and Technology, 23.06.2019 03:50
Iam a bacterium. i cause stomach cramps and diarrhea. i am caused by eating rotten foodssuch as chicken, fish, or eggs. sometimes turtles carry my bacteria.what am i?
Answers: 2
Your team at amazon is overseeing the design of a new high-efficiency data center at HQ2. A power gr...
Mathematics, 13.12.2021 18:40
English, 13.12.2021 18:40
Mathematics, 13.12.2021 18:40
Spanish, 13.12.2021 18:40
Mathematics, 13.12.2021 18:40
English, 13.12.2021 18:40
SAT, 13.12.2021 18:40
Mathematics, 13.12.2021 18:40
Mathematics, 13.12.2021 18:40