subject

Which of the following is responsible for maximizing building efficiency by managing all of a building's electrical and mechanical operations? automated building management (ABM)

computer-aided design (CAD)

building automation system (BAS)

operations management system (OMS)

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 01:30
Someone wishes to run the software on another computer system that runs an operating system that does not support the software what can he do
Answers: 3
question
Computers and Technology, 22.06.2019 22:50
Assume the existence of a bankaccount class. define a derived class, savingsaccount that contains two instance variables: the first a double, named interestrate, and the second an integer named interesttype. the value of the interesttype variable can be 1 for simple interest and 2 for compound interest. there is also a constructor that accepts two parameters: a double that is used to initialize the interestrate variable, and a string that you may assume will contain either "simple", or "compound", and which should be used to initialize the interesttype variable appropriately. there should also be a pair of functions getinterestrate and getinteresttype that return the values of the corresponding data members (as double and int respectively).
Answers: 2
question
Computers and Technology, 23.06.2019 22:30
You draw two cards from a standard deck of 52 cards, but before you draw the second card, you put the first one back and reshuffle the deck. (a) are the outcomes on the two cards independent? why?
Answers: 3
question
Computers and Technology, 24.06.2019 12:00
Which spreadsheet operation does a look function perform?
Answers: 1
You know the right answer?
Which of the following is responsible for maximizing building efficiency by managing all of a buildi...
Questions
question
Mathematics, 03.06.2021 01:30