subject
Computers and Technology, 16.10.2020 07:01 ohgeezy

Count the number of missing values for the variables A, B, and C in the Missing data set. Add the cumulative number of missing values to each observation (use variable names MissA, MissB, and MissC). Use the MISSING function to test for the missing values.

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 18:40
Mariah was working on a multimedia presentation that included both video and audio files. the file was huge, and she wanted to send it to her coworker in another office. she needed to reduce the size of the file so that it could be transmitted faster. the utility she used to do this was
Answers: 2
question
Computers and Technology, 22.06.2019 19:10
How might the success of your campaign be affected if you haven’t carefully completed all field data or if you accidentally insert the wrong merge field in the document?
Answers: 1
question
Computers and Technology, 22.06.2019 20:00
What is the term for water wave that is created by an underwater earthquake
Answers: 1
question
Computers and Technology, 23.06.2019 17:30
When making changes to optimize part of a processor, it is often the case that speeding up one type of instruction comes at the cost of slowing down something else. for example, if we put in a complicated fast floating-point unit, that takes space, and something might have to be moved farther away from the middle to accommodate it, adding an extra cycle in delay to reach that unit. the basic amdahl's law equation does not take into account this trade-off. a. if the new fast floating-point unit speeds up floating-point operations by, on average, 2ă—, and floating-point operations take 20% of the original program's execution time, what is the overall speedup (ignoring the penalty to any other instructions)? b. now assume that speeding up the floating-point unit slowed down data cache accesses, resulting in a 1.5ă— slowdown (or 2/3 speedup). data cache accesses consume 10% of the execution time. what is the overall speedup now? c. after implementing the new floating-point operations, what percentage of execution time is spent on floating-point operations? what percentage is spent on data cache accesses?
Answers: 2
You know the right answer?
Count the number of missing values for the variables A, B, and C in the Missing data set. Add the cu...
Questions
question
Mathematics, 22.02.2021 19:10
question
Mathematics, 22.02.2021 19:10