subject

Your supervisor said, "Integration testing is a waste of time. If each program is tested adequately, integration testing is not needed. Instead, we should move on to system testing as soon as possible. If modules don’t interact properly, we’ll handle it then." Do you agree or disagree with this comment?

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 08:00
Aplan to budget time for studying and activities is referred to as a study routine. study habits. study skills. a study schedule.
Answers: 1
question
Computers and Technology, 22.06.2019 17:00
Aisha has finished working on a word processing document that contains 15 pages. she has added some special elements in the first three pages, page 9 and 10, and page 15 from the document. she wants to print only these pages to see how they look. which option is the correct way to represent (in the print dialog box) the pages that aisha wants to print
Answers: 3
question
Computers and Technology, 24.06.2019 02:10
Aspeed limit sign that says "night" indicates the legal speed between sunset and sunrise.
Answers: 2
question
Computers and Technology, 24.06.2019 14:30
Two students are discussing electricity that has a frequency of 60 hz. student a says that this type of electricity is referred to as ac. student b says that in this type of electricity, the electrons flow in only one direction. which of the following statements is correct? a. only student a is correct b. only student b is correct c. both of the two students are correct d. neither of the two students is correct
Answers: 1
You know the right answer?
Your supervisor said, "Integration testing is a waste of time. If each program is tested adequately,...
Questions
question
Biology, 28.02.2020 19:08