subject
Computers and Technology, 25.04.2020 03:51 TamB01

Your co-worker is envisioning a new computer with an increased clock rate that will be able to run a daily log program in 2 seconds. Currently this log program requires 5 seconds to complete on an old computer running a 4 GHz clock. Provided the new computer requires 1.6 times as many clock cycles as the old computer what will be the target clock rate for the new computer

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 23.06.2019 00:00
Which is the correct sequence of steps to set up a document in landscape orientation? a. select page setup from the file menu. then click the margins tab and select landscape. b. select page setup from the edit menu. then click the margins tab and select landscape. c. select page setup from the insert menu. then click the margins tab and select landscape. d. select page setup from the format menu. then click the margins tab and select landscape
Answers: 1
question
Computers and Technology, 23.06.2019 19:00
Now you’re on your own. include a short summary of this section with plots in your lab report. write a matlab script file to do steps (a) through (d) below. include a listing of the script file with your report. 1 the soundsc(xx,fs) function requires two arguments: the first one (xx) contains the vector of data to be played, the second argument (fs) is the sampling rate for playing the samples. in addition, soundsc(xx,fs) does automatic scaling and then calls sound(xx,fs) to actually play the signal. mcclellan, schafer, and yoder, dsp first, 2e, isbn 0-13-065562-7. prentice hall, upper saddle river, nj 07458. c 2015 pearson education, inc. 4 mcclellan, schafer and yoder, signal processing first. prentice hall, upper saddle river, new jersey, 2003. c 2003 prentice hall. (a) generate a time vector (tt) to cover a range of t that will exhibit approximately two cycles of the 4000 hz sinusoids defined in the next part, part (b). use a definition for tt similar to part 2.2(d). if we use t to denote the period of the sinusoids, define the starting time of the vector tt to be equal to t , and the ending time as ct . then the two cycles will include t d 0. finally, make sure that you have at least 25 samples per period of the sinusoidal wave. in other words, when you use the colon operator to define the time vector, make the increment small enough to generate 25 samples per period. (b) generate two 4000 hz sinusoids with arbitrary amplitude and time-shift. x1.t / d a1 cos.2
Answers: 1
question
Computers and Technology, 24.06.2019 18:20
Use a while-end loop in a script file to calculate the sum of the first n terms of the series: summation sign on the top n bottom k=1 : )^k * k^2 +5k)/3^k show the script file and the two results of n = 10 and n = 20.
Answers: 2
question
Computers and Technology, 25.06.2019 08:20
The binary numbering system uses only two symbols—the digits 0 and 1—to represent all possible numbers. - true or false
Answers: 3
You know the right answer?
Your co-worker is envisioning a new computer with an increased clock rate that will be able to run a...
Questions
question
English, 24.09.2019 17:30