subject

Jamal is creating a presentation for a report on engineers. He wants to use a template. How can he access different options for his presentation? Check all that apply.

A - by launching the PowerPoint application.
B - by going to the Backstage view and clicking New.
C - by clicking the Design tab and choosing themes.
D - by opening a blank presentation and adding a theme.
E - by inserting a desired template into the PowerPoint workspace.

!I will give brainliest!

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 21.06.2019 23:00
Describe in pseudocode an algorithm that given an integer n and a linked list of elements increases the linked list by a factor of n by replacing each element in the original list with n copies of that element. for example, if l: [18, 7, 4, 24, 11] and n = 3 the resulting list should be l: [18, 18, 18, 7, 7, 7, 4, 4, 4, 24, 24, 24, 11, 11, 11]. if the value of n is less than or equal to 0, the list should be empty after the call. what’s the running time of your algorithm?
Answers: 3
question
Computers and Technology, 22.06.2019 21:30
After you clean an engine with hot water spray, it seems to stall; when it doesn't stall, it's idling noisily. technician a says to check for loose bolts on the flex plate near the torque converter. technician b says to wipe down the spark plug wires and the distributor cap. who is correct? a. technician a b. both technicians a and b c. technician b
Answers: 1
question
Computers and Technology, 23.06.2019 07:50
Apython programming question: assume s is a string of lower case characters. write a program that prints the number of times the string 'bob' occurs in s. for example, if s = 'azcbobobegghakl', then your program should print number of times bob occurs is: 2
Answers: 3
question
Computers and Technology, 23.06.2019 18:30
Write a program that prints the day number of the year, given the date in the form month-day-year. for example, if the input is 1-1-2006, the day number is 1; if the input is 12-25-2006, the day number is 359. the program should check for a leap year. a year is a leap year if it is divisible by 4, but not divisible by 100. for example, 1992 and 2008 are divisible by 4, but not by 100. a year that is divisible by 100 is a leap year if it is also divisible by 400. for example, 1600 and 2000 are divisible by 400. however, 1800 is not a leap year because 1800 is not divisible by 400.
Answers: 3
You know the right answer?
Jamal is creating a presentation for a report on engineers. He wants to use a template. How can he a...
Questions
question
History, 11.10.2019 08:00
question
Mathematics, 11.10.2019 08:00