subject
Computers and Technology, 29.01.2020 05:41 aisha82

Which of the following project types implements changes to an existing system to enable operation in a different technology environment? select one: a. enhancement b. innovation c. maintenance d. innovation

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 17:00
Match the following. 1. show grouping of word processing tasks that can be performed quick access toolbar 2. shortcut location for commonly used elements scroll bars 3. organized commands used to modify documents ribbon 4. used to align and measure content in a word screen zoom bar 5. vertical and horizontal bars that are used to navigate through a document contextual tabs 6. displays the name of the document in use ruler 7. allows users to enlarge or shrink a visual of a word document title bar
Answers: 2
question
Computers and Technology, 24.06.2019 04:10
Write a program that reads a set of floating-point values. ask the user to enter the values, then print • the average of the values. • the smallest of the values. • the largest of the values. • the range, that is the difference between the smallest and largest. of course, you may only prompt for the values once.
Answers: 3
question
Computers and Technology, 24.06.2019 21:30
How is a wan different than a lan? both connect computers, but only wan users don’t need the same operating system. both are peer-to-peer networks, but only a wan requires networking hardware. both network computers, but only a wan can cover larger geographical ranges. both connect computers to the internet, but only wan connects to the cloud.
Answers: 1
question
Computers and Technology, 25.06.2019 00:40
Roger ginde is developing a program in supply chain management certification for managers. ginde has listed a number of activities that must be completed before a training program of this nature could be conducted. the activities, immediate predecessors, and times appear in the accompanying table: activity immediate predecessor(s) time (days) a -− 44b -− 55 c -− 11 d b 1010 e a, d 55 f c 55 g e, f 1010 calculate the slack time. show the details.
Answers: 2
You know the right answer?
Which of the following project types implements changes to an existing system to enable operation in...
Questions
question
Mathematics, 01.11.2019 00:31