subject
Chemistry, 16.10.2019 20:30 montgomerykarloxc24x

Stockings inc. is making nylon 6,6 in 8 hour shifts. one batch is produced per shift using equimolar amounts of the reactants with a conversion of 99%. after each run the product is extruded and chopped into pellets.

a. what is the number average molecular weight?

b. the afternoon shift operator dumped in too much adipic acid. from her records you calculate that the molar ratio was 2% excess adipic acid. assuming the batch went to the usual conversion what was mn ?

c. the night shift operator weighed everything correctly but fell asleep and let the reaction run too long to 99.5% conversion. what is mn for this batch?

d. how should the engineer mix these batches to come within ±10% of the usual specification of mn ? what will be mw ?

e. what would happen to mn and mw if the mixture is heated?

ansver
Answers: 1

Another question on Chemistry

question
Chemistry, 22.06.2019 11:00
Surface currents are caused by blank space . question 14 options: surface currents are caused by? differences in water temperature high salinity differences in density wind forces
Answers: 1
question
Chemistry, 22.06.2019 11:00
Iron (3) oxide will decompose in the presence of hydrogen gas and heater to produced iron and digydrogen monoxide white a balanced chemical equation
Answers: 1
question
Chemistry, 22.06.2019 19:30
Acetylene gas c2h2 undergoes combustion to produce carbon dioxide and water vapor how many grams of water are produced by the same amount of c2h2?
Answers: 2
question
Chemistry, 22.06.2019 22:30
3.09 lab: reaction of metals 1 which combinations of substances resulted in a chemical change? for each metal that participated in a chemical change, write the type of metal it is, based on your examination of the periodic table. were there any metallic compounds that did not react with either the acid or the base? write the type of metal, based on your examination of the periodic table. make a general statement about the reactivity of the metals in this experiment.
Answers: 1
You know the right answer?
Stockings inc. is making nylon 6,6 in 8 hour shifts. one batch is produced per shift using equimolar...
Questions
question
Mathematics, 22.01.2021 21:30
question
Mathematics, 22.01.2021 21:30
question
Mathematics, 22.01.2021 21:30