subject
Chemistry, 24.09.2019 19:00 lexiecooley

Aprocess that is being considered for construction has been through several technical reviews; block flow, process flow, and piping and instrumentation diagrams are available for the process. explain the changes that would have to be made to the three principal diagrams if during a final preconstruction review, the following changes were made a. the area of a filter press had been specified incorrectly as 300 m instead of 350 m b. the cooling water flowrate needed for a heat exchanger was calculated incorrectly and is now 50% greater than before. c. several globe valves have been added to the plant to allow for manual regulation of flowrates. d. the cooling loop for a reactor has been rerouted (through one additional heat exchanger and one cooler) to improve process heat integration e. there is a change in the control strategy for a distillation tower bottom level. it has been decided that the level of the distillation tower will be controlled by regulating an existing control valve at the feed line to the tower rather than the tower bottom outlet flowrate.

ansver
Answers: 2

Another question on Chemistry

question
Chemistry, 22.06.2019 01:00
What is the equilibrium constant of aa+bb=cc+dd
Answers: 1
question
Chemistry, 22.06.2019 12:00
In a laboratory, 1.55mg of an organic compound containing carbon, hydrogen, and oxygen is burned for analysis. this combustion resulted in the formation of 1.45mg of carbon dioxide and .89 mg of water. what is the empirical formula for this compound?
Answers: 1
question
Chemistry, 22.06.2019 20:30
Which states of matter have particles that move independently of one another with very little attraction?
Answers: 1
question
Chemistry, 22.06.2019 23:00
What is the correct lewis dot structure for arsenic?
Answers: 2
You know the right answer?
Aprocess that is being considered for construction has been through several technical reviews; bloc...
Questions
question
Mathematics, 29.01.2021 01:00