subject
Business, 31.07.2019 13:00 dward5823

Which are three of the four main economic variables?

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 21:20
Abakery wants to determine how many trays of doughnuts it should prepare each day. demand is normal with a mean of 5 trays and standard deviation of 1 tray. if the owner wants a service level of at least 95%, how many trays should he prepare (rounded to the nearest whole tray)? assume doughnuts have no salvage value after the day is complete.
Answers: 2
question
Business, 22.06.2019 05:00
Xie company identified the following activities, costs, and activity drivers for 2017. the company manufactures two types of go-karts: deluxe and basic. activity expected costs expected activity handling materials $ 625,000 100,000 parts inspecting product 900,000 1,500 batches processing purchase orders 105,000 700 orders paying suppliers 175,000 500 invoices insuring the factory 300,000 40,000 square feet designing packaging 75,000 2 models required: 1. compute a single plantwide overhead rate, assuming that the company assigns overhead based on 125,000 budgeted direct labor hours. 2. in january 2017, the deluxe model required 2,500 direct labor hours and the basic model required 6,000 direct labor hours. assign overhead costs to each model using the single plantwide overhead rate.
Answers: 3
question
Business, 22.06.2019 16:00
In a perfectly competitive market, the long-run market supply curve tends to be horizontal or nearly so. what is another way to state this fact? (a) market supply is much more elastic in the long run than the short run. (b) in the long run, average total cost is minimized. (c) in the long run, price equals marginal cost. (d) market supply is much less elastic in the long run than the short run.
Answers: 1
question
Business, 22.06.2019 16:40
Job 456 was recently completed. the following data have been recorded on its job cost sheet: direct materials $ 2,418 direct labor-hours 74 labor-hours direct labor wage rate $ 13 per labor-hour machine-hours 137 machine-hours the corporation applies manufacturing overhead on the basis of machine-hours. the predetermined overhead rate is $14 per machine-hour. the total cost that would be recorded on the job cost sheet for job 456 would be: multiple choice $3,380 $5,298 $6,138 $2,622
Answers: 1
You know the right answer?
Which are three of the four main economic variables?...
Questions
question
Mathematics, 09.01.2021 23:20
question
Mathematics, 09.01.2021 23:20
question
Mathematics, 09.01.2021 23:20
question
Mathematics, 09.01.2021 23:20
question
Arts, 09.01.2021 23:30
question
Mathematics, 09.01.2021 23:30