subject
Business, 23.07.2019 05:10 couscous5307

Agent sally has been with black realty for over three years and has worked up to the top agent in the firm. her commission percentage rate is double that of a starting agent. based on this information, what type of compensation plan does the black agency have in place?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 15:00
Because gloria's immediate concern was the perceived gender discrimination, she would be more concerned about than intent, resultsresults, intentstatistics, trendsrace,gendergender,race
Answers: 2
question
Business, 22.06.2019 19:20
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
question
Business, 22.06.2019 19:40
Banana computers has decided to procure processing chips required for its laptops from external suppliers instead of manufacturing them in their own facilities. how will this decision affect the firm? a. the firm will be protected against the principal-agent problem. b. the firm's administrative costs will be low because of necessary bureaucracy. c. the firm will have more flexibility in purchasing and comparing prices of goods and services. d. the firm will have high-powered incentives, such as hourly wages and salaries.
Answers: 3
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
Agent sally has been with black realty for over three years and has worked up to the top agent in th...
Questions
question
Chemistry, 04.12.2019 05:31