subject
Business, 03.12.2021 02:00 QueenNerdy889

The sum of those costs that are fixed in total, regardless of how much is produced, is called the total . Multiple choice question.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 08:30
Match the given situations to the type of risks that a business may face while taking credit. 1. beta ltd. had taken a loan from a bank for a period of 15 years, but its sales are gradually showing a decline. 2. alpha ltd. has taken a loan for increasing its production and sales, but it has not conducted any research before making this decision. 3. delphi ltd. has an overseas client. the economy of the client’s country is going through severe recession. 4. delphi ltd. has taken a short-term loan from the bank, but its supply chain logistics are not in place. a. foreign exchange risk b. operational risk c. term of loan risk d. revenue projections risk
Answers: 3
question
Business, 22.06.2019 18:00
If you would like to ask a question you will have to spend some points
Answers: 1
question
Business, 22.06.2019 19:00
Lucy is catering an important luncheon and wants to make sure her bisque has the perfect consistency. for her bisque to turn out right, it should have the consistency of a. cold heavy cream. b. warm milk. c. foie gras. d. thick oatmeal.
Answers: 3
question
Business, 23.06.2019 01:00
The monthly demand equation for an electric utility company is estimated to be p equals 60 minus left parenthesis 10 superscript negative 5 baseline right parenthesis x, where p is measured in dollars and x is measured in thousands of killowatt-hours. the utility has fixed costs of $3 comma 000 comma 000 per month and variable costs of $32 per 1000 kilowatt-hours of electricity generated, so the cost function is upper c left parenthesis x right parenthesis equals 3 times 10 superscript 6 baseline plus 32 x. (a) find the value of x and the corresponding price for 1000 kilowatt-hours that maximize the utility's profit. (b) suppose that the rising fuel costs increase the utility's variable costs from $32 to $38, so its new cost function is upper c 1 left parenthesis x right parenthesis equals 3 times 10 superscript 6 baseline plus 38 x. should the utility pass all this increase of $6 per thousand kilowatt-hours on to the consumers?
Answers: 2
You know the right answer?
The sum of those costs that are fixed in total, regardless of how much is produced, is called the to...
Questions
question
Mathematics, 28.01.2021 19:50