subject
Business, 30.11.2021 23:50 lolz55678

Sharon Smith will receive $1 million in 50 years. The discount rate is 13%. As an alternative, she can receive $1,000 today. Which should she choose

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 20:00
Qwest airlines has implemented a program to recycle all plastic drink cups used on their aircraft. their goal is to generate $7 million by the end of the recycle program's five-year life. each recycled cup can be sold for $0.005 (1/2 cent). a. how many cups must be recycled annually to meet this goal? assume uniform annual plastic cup usage and a 0% interest rate. b. repeat part (a) when the annual interest rate is 12%. c. why is the answer to part (b) less than the answer to part (a)?
Answers: 1
question
Business, 22.06.2019 20:00
Afirm is producing at minimum average total cost with its current plant. draw the firm's long-run average cost curve. label it. draw a point on the lrac curve at which the firm cannot lower its average total cost. draw the firm's short-run average total cost curve that is consistent with the point you have drawn. label it.g
Answers: 2
question
Business, 22.06.2019 21:50
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
question
Business, 22.06.2019 23:00
Which of the following is not one of the four principles of bottleneck management? a. increasing capacity at non-bottleneck stations is a mirageb. lost time at the bottleneck is lost system capacity.c. release work orders to the system at the bottleneck's capacity pace.d. increased bottleneck capacity is increased system capacity.e. bottlenecks should be moved to the end of the system process.
Answers: 1
You know the right answer?
Sharon Smith will receive $1 million in 50 years. The discount rate is 13%. As an alternative, she c...