On 2 January 2021 Sunny Toys Australia contracted to sell to Taipei Tinny World(“TTW”), a children’s toys store in the city of Taipei, Taiwan, 250 solar-powered walking crocodile toys. The price was AUD 5,000 for delivery FOR any port in Australia. Since TTW was the first-time customer, payment would be by letter of credit. On 9 January, Sunny Toys Australia received an advice from Austral Bank that China Bank in Taiwan had issued a letter of credit in favour of Solar Toys as beneficiary. The letter of credit was payable upon presentation of the beneficiary’s bill of exchange drawn on China Bank together with the following documents: -Commercial Invoice;
-Full set of clean on board negotiable marine bills of lading consigned to order blank endorsed marked freight prepaid;
-Certificate of origin signed by Australian Customs or its authorized agency;
-Certificate of quality issued by local authority;
-Packing list in duplicate
Austral bank has been authorized to act as advising and negotiating bank. On 10 January, the goods were loaded on board the ship and a clean bill of lading was issued. The shipping documents together with a bill of exchange drawn on China Bank were presented to Austral Bank on 14 January. The Beneficiary Presented Documents within the expiry date of the L/C but they contain discrepancies. The beneficiary collected the offending documents for correction (leaving the rest with the bank) and then in due course presented correct documents, however, in the interim the L/C has expired. On 20 January Austral Bank indicated that it refused to pay because the documents presented did not conform to the requirements of the letter of credit. Discuss the following questions and give your arguments:
2.1.Should Austral Bank now reject the documents for “credit expired”?
2.2 It appears that the problem with the documents is that the bill of lading presented by Sunny Toys is marked “Freight to be Collected'' instead of “Freight Prepaid” as required under the terms of the letter of credit. Is this a discrepancy?
2.3 If L/C (which allows transshipment) calls for shipment from an Australian seaport, the Bill of lading shows goods were loaded on a vessel from Northport (New Zealand) to Sydney then their transshipment to another vessel from Sydney . To the ultimate destination as specified in the L/C. Is this acceptable?
2.4 L/C issued in favour of a beneficiary in Sydney, Australia Calls for a certificate of quality issued by the “local authority”, when presented it has been issued by the authority in Brisbane, Australia. Would this be acceptable?
2.5 When Austral Bank contacted China Bank to request a waiver of the discrepancies, China Bank refused. The reason for the refusal soon becomes clear –senior executives within TTW have absconded with nearly all of the firm’s liquid assets, and the firm has been placed in liquidation. Discuss Sunny Toys’ rights, if any, in relation to Austral Bank and China Bank

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 20:30
Which of the following best describes how the federal reserve bank banks during a bank run? a. the federal reserve bank has the power to take over a private bank if customers demand too many withdrawals. b. the federal reserve bank can provide a short-term loan to banks to prevent them from running out of money. c. the federal reserve bank regulates exchanges to prevent the demand for withdrawals from rising above the required reserve ratio. d. the federal reserve bank acts as an insurance company that pays customers if their bank fails. 2b2t
Answers: 3
question
Business, 22.06.2019 15:40
Aprice control is: question 1 options: a)a tax on the sale of a good that controls the market price.b)an upper limit on the quantity of some good that can be bought or sold.c)a legal restriction on how high or low a price in a market may go.d)control of the price of a good by the firm that produces it.
Answers: 1
question
Business, 22.06.2019 19:00
James is an employee in the widget inspection department of xyz systems, a government contractor. james was part of a 3-person inspection team that found a particular batch of widgets did not meet the exacting requirements of the u.s. government. in order to meet the tight deadline and avoid penalties under the contract, james' boss demanded that the batch of widgets be sent in fulfillment of the government contract. when james found out, he went to the vice president of the company and reported the situation. james was demoted by his boss, and no longer works on government projects. james has a:
Answers: 3
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
On 2 January 2021 Sunny Toys Australia contracted to sell to Taipei Tinny World(“TTW”), a children’s...
Questions
question
English, 24.09.2021 19:20
question
Mathematics, 24.09.2021 19:20