Windhoek Mines, Ltd., of Namibia, is contemplating the purchase of equipment to exploit a mineral deposit on land to which the company has mineral rights. An engineering and cost analysis has been made, and it is expected that the following cash flows would be associated with opening and operating a mine in the area: Cost of new equipment and timbers $ 410,000
Working capital required $ 225,000
Annual net cash receipts $ 160,000 *
Cost to construct new roads in year three $ 65,000
Salvage value of equipment in four years $ 90,000
*Receipts from sales of ore, less out-of-pocket costs for salaries, utilities, insurance, and so forth. The mineral deposit would be exhausted after four years of mining. At that point, the working capital would be released for reinvestment elsewhere. The company’s required rate of return is 19%.
Required
Determine the net present value of the proposed mining project. (Any cash outflows should be indicated by a minus sign. Use the appropriate table to determine the discount factor(s).)
Now
Purchase of equipment
Working capital investment
Annual net cash receipts
Road construction
Working capital released
Salvage value of equipment
Total cash flows
Discount factor (20%)
Present value
Net present value

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 12:10
Bonds often pay a coupon twice a year. for the valuation of bonds that make semiannual payments, the number of periods doubles, whereas the amount of cash flow decreases by half. using the values of cash flows and number of periods, the valuation model is adjusted accordingly. assume that a $1,000,000 par value, semiannual coupon us treasury note with three years to maturity has a coupon rate of 3%. the yield to maturity (ytm) of the bond is 7.70%. using this information and ignoring the other costs involved, calculate the value of the treasury note:
Answers: 1
question
Business, 22.06.2019 20:20
Direct materials (4.2 x $15) $ 63direct labor ($12 x 17.5) $210manufacturing overhead ($2.40 x 17.5) $42total job cost $ 315dougan, inc. allocates overhead based on a predetermined overhead rate of $2.40 per direct labor hour. employees are paid $12.00 per hour. job 24 requires 4.2 pounds of direct materials at a cost of $15.00 per pound. employees worked a total of 17.5 hours to complete the job. actual manufacturing overhead costs totaled $80,000 for the year for the company. how much is the cost of job 24?
Answers: 1
question
Business, 22.06.2019 21:10
You are the manager of a large crude-oil refinery. as part of the refining process, a certain heat exchanger (operated at high temperatures and with abrasive material flowing through it) must be replaced every year. the replacement and downtime cost in the first year is $165 comma 000. this cost is expected to increase due to inflation at a rate of 7% per year for six years (i.e. until the eoy 7), at which time this particular heat exchanger will no longer be needed. if the company's cost of capital is 15% per year, how much could you afford to spend for a higher quality heat exchanger so that these annual replacement and downtime costs could be eliminated?
Answers: 1
question
Business, 22.06.2019 23:00
Which of the following is not one of the four principles of bottleneck management? a. increasing capacity at non-bottleneck stations is a mirageb. lost time at the bottleneck is lost system capacity.c. release work orders to the system at the bottleneck's capacity pace.d. increased bottleneck capacity is increased system capacity.e. bottlenecks should be moved to the end of the system process.
Answers: 1
You know the right answer?
Windhoek Mines, Ltd., of Namibia, is contemplating the purchase of equipment to exploit a mineral de...
Questions
question
Mathematics, 12.07.2019 13:00
question
Mathematics, 12.07.2019 13:00
question
Mathematics, 12.07.2019 13:00