subject
Business, 20.09.2019 10:30 pierceybbpow8o39

The predetermined overhead rate for neutronics, inc. is 70% of direct labor cost. the company incurs $250,000 of factory labor costs during the month and $180,000 of that cost is direct labor and $70,000 is indirect labor. actual overhead incurred was $130,000. what should be the amount of overhead debited to work in process inventory?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 03:00
If you were running a company, what are at least two things you could do to improve its productivity.
Answers: 1
question
Business, 22.06.2019 05:50
Nichols inc. manufactures remote controls. currently the company uses a plantminuswide rate for allocating manufacturing overhead. the plant manager is considering switchingminusover to abc costing system and has asked the accounting department to identify the primary production activities and their cost drivers which are as follows: activities cost driver allocation rate material handling number of parts $5 per part assembly labor hours $20 per hour inspection time at inspection station $10 per minute the current traditional cost method allocates overhead based on direct manufacturing labor hours using a rate of $20 per labor hour. what are the indirect manufacturing costs per remote control assuming an method is used and a batch of 10 remote controls are produced? the batch requires 100 parts, 5 direct manufacturing labor hours, and 3 minutes of inspection time.
Answers: 2
question
Business, 22.06.2019 07:20
Richardson hired j.c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j.c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
question
Business, 22.06.2019 16:40
Job applications give employers uniform information for all employees,making it easier to
Answers: 1
You know the right answer?
The predetermined overhead rate for neutronics, inc. is 70% of direct labor cost. the company incurs...
Questions
question
Biology, 22.07.2019 09:20
question
Biology, 22.07.2019 09:20
question
Mathematics, 22.07.2019 09:20