subject
Business, 01.03.2021 21:30 electrofy456

A new roof on a house will cost $10,000. It will be installed in 20 years. If the interest rate is 8% per year, how much must be saved each year to accumulate $10,000 after 20 years?

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 18:20
Write two goals for yourself that will aid you in pursuing your post-secondary education or training. with this
Answers: 1
question
Business, 22.06.2019 17:30
Dr. sperry, a biologist, is using excel to track growth rates of different populations of bacteria. she has a very complex formula in one cell. it begins with “round”. dr. sperry would like to see exactly how excel’s calculation reached the final rounded value that she sees in the cell. what could dr. sperry do to best understand how the calculation was made? try different formulas on her own until she reaches the value shown in excel click on the evaluate formula button in the formulas tab and then click “step in” select the cell and then look at the formula in the formula field of the ribbon remove “round” from the formula in order to see the actual value before rounding
Answers: 2
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
question
Business, 22.06.2019 19:50
The new york company produces high quality chairs. variable manufacturing overhead is applied at a standard rate of $12 per machine hour. each chair requires a standard quantity of six machine hours. production for the month totaled 4,000 units. calculate: the standard cost per unit for variable overhead. select one: a. $130,000 b. $192,000 c. $90,000 d. $100,000
Answers: 2
You know the right answer?
A new roof on a house will cost $10,000. It will be installed in 20 years. If the interest rate is 8...
Questions
question
Mathematics, 15.06.2021 21:20
question
Geography, 15.06.2021 21:20
question
Mathematics, 15.06.2021 21:20
question
Computers and Technology, 15.06.2021 21:20
question
Advanced Placement (AP), 15.06.2021 21:20
question
Biology, 15.06.2021 21:20
question
Mathematics, 15.06.2021 21:20
question
Mathematics, 15.06.2021 21:20
question
Biology, 15.06.2021 21:20
question
Mathematics, 15.06.2021 21:20