(Geneva Watch) The Geneva Watch Corporation manufactures watches on a conveyor belt with six stations. One worker stands at each station and performs the following tasks: Station Tasks Processing Time (seconds) A: Preparation 1 Heat-stake lens to bezel Inspect bezel Clean switch holes Install set switch in bezel Total time for A 14 26 10 18 68 B: Preparation 2 Check switch travel Clean inside bezel Install module in bezel Total time for B 23 12 25 60 C: Battery installation Install battery clip on module Heat-stake battery clip on module Install 2 batteries in module Check switch Total time for C 20 15 22 13 70 D: Band installation Install band Inspect band Total time for D 45 13 58 E: Packaging preparation Cosmetic inspection Final test Total time for E 20 55 75 F: Watch packaging Place watch and cuff in display box Place cover in display box base Place owner’s manual, box into tub Total time for F 20 14 30 64 These six workers begin their workday at 8:00 a. m. and work steadily until 4:00 p. m. At 4:00, no new watch parts are introduced into station A and the conveyor belt continues until all of the work-in-process inventory has been processed and leaves station F. Thus, each morning the workers begin with an empty system. a. What is the bottleneck in this process? [4.1] b. What is the capacity, in watches per hour, of the assembly line (ignore the time it takes for the first watch to come off the line)? [4.1]

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 19:10
Maldonia has a comparative advantage in the production of , while lamponia has a comparative advantage in the production of . suppose that maldonia and lamponia specialize in the production of the goods in which each has a comparative advantage. after specialization, the two countries can produce a total of million pounds of lemons and million pounds of coffee.
Answers: 3
question
Business, 21.06.2019 20:30
What is the difference between a public and a private corporation?
Answers: 1
question
Business, 21.06.2019 20:40
•broussard skateboard’s sales are expected to increase by 15% from $8 million in 2016 to $9.2 million in 2017. its assets totaled $5 million at the end of 2016. broussard is already at full capacity, so its assets must grow at the same rate as projected sales. at the end of 2016, current liabilities were $1.4 million, consisting of $450,000 of accounts payable, $500,000 of notes payable, and $450,000 of accruals. the after-tax profit margin is forecasted to be 6%, and the forecasted payout ratio is 40%. use the afn equation to forecast broussard’s additional funds needed for the coming year
Answers: 2
question
Business, 22.06.2019 05:20
142"what is the value of n? soefon11402bebe99918+19: 00esseeshop60-990 0esle
Answers: 1
You know the right answer?
(Geneva Watch) The Geneva Watch Corporation manufactures watches on a conveyor belt with six station...
Questions
question
Mathematics, 19.03.2020 08:27
question
Mathematics, 19.03.2020 08:27
question
Biology, 19.03.2020 08:27