Consider a process consisting of three resources. Assume there exists unlimited demand for the product. • Resource 1 has a processing time of 6 minutes per unit.
• Resource 2 has a processing time of 3 minutes per unit.
• Resource 3 has a processing time of 5 minutes per unit.
All three resources are staffed by one worker.
d. Draw a process flow diagram of this process.
e. What is the capacity of resource 2?
f. What is the bottleneck in the process?
g. What is the utilization of resource 2?
h. How long does it take the process to produce 200 units starting with an empty system, assuming this is a worker-paced process?

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 21:00
Consider a small island country whose only industry is weaving. the following table shows information about the small economy in two different years. complete the table by calculating physical capital per worker as well as labor productivity. hint: recall that productivity is defined as the amount of goods and services a worker can produce per hour. in this problem, measure productivity as the quantity of goods per hour of labor. year physical capital labor force physical capital per worker labor hours output labor productivity (looms) (workers) (looms) (hours) (garments) (garments per hour of labor) 2024 160 40 1,800 14,400 2025 180 60 3,900 23,400
Answers: 2
question
Business, 22.06.2019 00:50
At a roundabout, you must yield to a. already in the roundaboutb. entering the roundaboutc. only if their turn signal is ond. only if they honk at you
Answers: 1
question
Business, 22.06.2019 12:40
Alarge tank is filled to capacity with 500 gallons of pure water. brine containing 2 pounds of salt per gallon is pumped into the tank at a rate of 5 gal/min. the well-mixed solution is pumped out at the same rate. find the number a(t) of pounds of salt in the tank at time t.
Answers: 3
question
Business, 22.06.2019 19:00
Why is accountability important in managing safety
Answers: 2
You know the right answer?
Consider a process consisting of three resources. Assume there exists unlimited demand for the produ...
Questions