subject
Business, 16.11.2020 17:50 solivagantjn3010

A quality engineer has a manufacturing specification (in cm) of 1.00 plus or minus 0.05. Historical data indicates that if the quality characteristic takes on values larger than 1.05 cm or smaller than 0.95 cm, the product fails and a cost of $50 is incurred. Determine the Taguchi Loss Function and estimate the loss for a dimension of 1.1 cm. A. $100 average loss per part in this set B. $150 average loss per part in this set C. $200 average loss per part in this set D. $250 average loss per part in this set E. $300 average loss per part in this set

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 07:50
Budget in this final week, you will develop a proposed budget of $150,000 for the first year of the program and complete the final concept paper for the proposed program due for senior management review. the budget should identify the program's anticipated expenses for the year ahead. budget line items should be consistent with the proposed program and staffing plan. using the readings for the week, the south university online library, and the internet, complete the following tasks: create a proposed budget of $150,000 for the first year of the proposed program including the cost for personnel, supplies, education materials, marketing costs, and so on in a microsoft excel spreadsheet. you may transfer your budget to your report. justify the cost for each item of the proposed budget in a budget narrative.
Answers: 2
question
Business, 22.06.2019 11:30
Leon and sara are arguing over when the best time is to degrease soup. leon says that it's easiest to degrease soup when it's boiling. sara says it's easiest to degrease soup when it's cold. who is correct? a. neither leon nor sara is correct. b. leon is correct. c. both leon and sara are correct. d. sara is correct. student b   incorrect which following answer correct?
Answers: 1
question
Business, 22.06.2019 15:00
Oerstman, inc. uses a standard costing system and develops its overhead rates from the current annual budget.the budget is based on an expected annual output of 120,000 units requiring 480,000 direct labor hours.(practical capacity is 500,000 hours)annual budgeted overhead costs total $772,800, of which $556,800 is fixed overhead.a total of 119,300 units, using 478,000 direct labor hours, were produced during the year.actual variable overhead costs for the year were $260,400 and actual fixed overhead costs were $555,450.required: 1. compute the fixed overhead spending variance and indicate if favorable or unfavorable.2. compute the fixed overhead volume variance and indicate if favorable or unfavorable.
Answers: 3
question
Business, 22.06.2019 16:40
Job 456 was recently completed. the following data have been recorded on its job cost sheet: direct materials $ 2,418 direct labor-hours 74 labor-hours direct labor wage rate $ 13 per labor-hour machine-hours 137 machine-hours the corporation applies manufacturing overhead on the basis of machine-hours. the predetermined overhead rate is $14 per machine-hour. the total cost that would be recorded on the job cost sheet for job 456 would be: multiple choice $3,380 $5,298 $6,138 $2,622
Answers: 1
You know the right answer?
A quality engineer has a manufacturing specification (in cm) of 1.00 plus or minus 0.05. Historical...
Questions
question
Mathematics, 13.09.2021 14:00
question
Mathematics, 13.09.2021 14:00
question
Mathematics, 13.09.2021 14:00
question
Chemistry, 13.09.2021 14:00
question
Mathematics, 13.09.2021 14:00