The normal time of the work cycle in a worker-machine system is 5.39 min. The operatorcontrolled portion of the cycle is 0.84 min. One work unit is produced each cycle. The machine cycle time is constant. (a) Using a PFD allowance factor of 16% and a machine allowance factor of 30%, determine the standard time for the work cycle. (b) If a worker assigned to this task completes 85 units during an 8-hour shift, what is the worker’s efficiency? (c) If it is known that a total of 42 min was lost during the 8-hour clock time due to personal needs and delays, what was the worker’s performance on the portion of the cycle he controlled?
Answers: 3
Business, 22.06.2019 10:20
Blue spruce corp. has the following transactions during august of the current year. aug. 1 issues shares of common stock to investors in exchange for $10,170. 4 pays insurance in advance for 3 months, $1,720. 16 receives $710 from clients for services rendered. 27 pays the secretary $740 salary. indicate the basic analysis and the debit-credit analysis.
Answers: 1
Business, 23.06.2019 00:10
Wang distributors has an annual demand for an airport metal detector of 1 comma 350 units. the cost of a typical detector to wang is $400. carrying cost is estimated to be 19% of the unit cost, and the ordering cost is $24 per order. if ping wang, the owner, orders in quantities of 300 or more, he can get a 10% discount on the cost of the detectors. should wang take the quantity discount? \
Answers: 1
Business, 23.06.2019 00:50
Mr. drucker uses a periodic review system to manage the inventory in his dry goods store. he likes to maintain 15 sacks of sugar on his shelves based on the annual demand figure of 225 sacks. it costs $2 to place an order for sugar and costs $1 to hold a sack in inventory for a year. mr. drucker checks inventory one day and notes that he is down to 9 sacks; how much should he order?
Answers: 1
The normal time of the work cycle in a worker-machine system is 5.39 min. The operatorcontrolled por...
Advanced Placement (AP), 06.11.2020 23:40
Social Studies, 06.11.2020 23:40
Spanish, 06.11.2020 23:40
English, 06.11.2020 23:40
Advanced Placement (AP), 06.11.2020 23:40
Advanced Placement (AP), 06.11.2020 23:40
Mathematics, 06.11.2020 23:40
Spanish, 06.11.2020 23:40
Mathematics, 06.11.2020 23:40
Mathematics, 06.11.2020 23:40
Arts, 06.11.2020 23:40
Spanish, 06.11.2020 23:40