subject
Business, 21.10.2020 16:01 conyers234

A worker-machine operation was found to involve 3.3 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker’s time averaged 1.8 minutes per cycle, and the worker was given a rating of 108 percent (machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 8 percent of work time which is applied only to the worker element (not the machine element), determine the standard time for this job.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 07:30
Most states have licensing registration requirements for child care centers and family daycare homes. these usually include minimum standard for operation. which of the following would you most likely find required in a statement of state licensing standards for child care centers?
Answers: 2
question
Business, 22.06.2019 07:30
Jewelry manufacturers produce a range of products such as rings, necklaces, bracelets, and brooches. what fundamental economic question are they addressing by offering this range of items?
Answers: 3
question
Business, 22.06.2019 12:40
Alarge tank is filled to capacity with 500 gallons of pure water. brine containing 2 pounds of salt per gallon is pumped into the tank at a rate of 5 gal/min. the well-mixed solution is pumped out at the same rate. find the number a(t) of pounds of salt in the tank at time t.
Answers: 3
question
Business, 22.06.2019 12:50
Two products, qi and vh, emerge from a joint process. product qi has been allocated $34,300 of the total joint costs of $55,000. a total of 2,900 units of product qi are produced from the joint process. product qi can be sold at the split-off point for $11 per unit, or it can be processed further for an additional total cost of $10,900 and then sold for $13 per unit. if product qi is processed further and sold, what would be the financial advantage (disadvantage) for the company compared with sale in its unprocessed form directly after the split-off point?
Answers: 2
You know the right answer?
A worker-machine operation was found to involve 3.3 minutes of machine time per cycle in the course...
Questions
question
Mathematics, 24.06.2019 14:00
question
Biology, 24.06.2019 14:00