subject
Business, 08.10.2020 14:01 bmr12

Consider two perfectly negatively correlated risky securities, X and Y. Security X has an expected rate of return of 9% and a standard deviation of return of 27%. Y has an expected rate of return of 17% and a standard deviation of return of 39%. What is the weight of security Y in the minimum variance portfolio? Enter your answer rounded to two decimal places. Do not enter % in the answer box. For example, if your answer is 0.12345 or 12.345% then enter as 12.35 in the answer box.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 10:30
6carla would like to buy a dress, a dresser for her bedroom, and a home theater system. she has one month's worth of living expenses in her emergency fund. carla decides to save for the home theater system. did carla make the right decision? why or why not? a. yes; her emergency fund is full and the other items will probably be less expensive. b. yes; she could save more for her emergency fund, but the home theater will be harder to save for. c. no; she should save more for her emergency fund because she has saved less than the recommended amount. d. no; she should have bought the dress and dresser first because she could afford them right away. reset next
Answers: 2
question
Business, 22.06.2019 11:20
Mae jong corp. issues $1,000,000 of 10% bonds payable which may be converted into 10,000 shares of $2 par value ordinary shares. the market rate of interest on similar bonds is 12%. interest is payable annually on december 31, and the bonds were issued for total proceeds of $1,000,000. in accounting for these bonds, mae jong corp. will: (a) first assign a value to the equity component, then determine the liability component. (b) assign no value to the equity component since the conversion privilege is not separable from the bond.(c) first assign a value to the liability component based on the face amount of the bond.(d) use the “with-and-without” method to value the compound instrument.
Answers: 3
question
Business, 22.06.2019 13:30
What do you recommend adam do to increase production in a business setting that does not seem to value high productivity?
Answers: 3
question
Business, 22.06.2019 14:20
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
You know the right answer?
Consider two perfectly negatively correlated risky securities, X and Y. Security X has an expected r...
Questions
question
Biology, 27.08.2019 19:40
question
Mathematics, 27.08.2019 19:40