subject
Business, 05.10.2020 19:01 dootdootkazoot

A borrower expresses concern that once he signs all the documents he will be "stuck" with a second mortgage. A good response by a Notary Signing Agent could be to

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 03:40
Electronics assembly inc. is a contract manufacturer that assembles consumer electronics for a number of companies. currently, the operations manager is assessing the capacity requirements as input into a bid for a job to assemble cell phones for a major global company. the company would assemble three models of cell phones in the same assembly cell. setup time between the phones is negligible. electronics assembly inc. operates two 8-hour shifts for 275 days per year. cell phone demand forecast (phones/year) processing time (minutes/phone) mars 47,000 19.8 saturn 35,000 20.7 neptune 7,500 16.2 a. calculate total capacity required by line. b. determine the total operating time available. c. calculate the total number of assembly cells. (round up your answer to the next whole number.)
Answers: 2
question
Business, 22.06.2019 04:00
Wallis company manufactures only one product and uses a standard cost system. the company uses a predetermined plantwide overhead rate that relies on direct labor-hours as the allocation base. all of the company's manufacturing overhead costs are fixed—it does not incur any variable manufacturing overhead costs. the predetermined overhead rate is based on a cost formula that estimated $2,886,000 of fixed manufacturing overhead for an estimated allocation base of 288,600 direct labor-hours. wallis does not maintain any beginning or ending work in process inventory.
Answers: 2
question
Business, 22.06.2019 11:40
Select the correct answer brian wants to add a chart to his dtp project. what is the best way he can do this? a draw the chart using the dtp program draw option b create the chart in a spreadsheet then import it c. use the dtp chart wizard to create the chart within the dtp d. create an image of the chart in an image editor then import the image e use html code to create a chart within the dtp program
Answers: 3
question
Business, 22.06.2019 14:30
Amethod of allocating merchandise cost that assumes the first merchandise bought was the first merchandise sold is called the a. last-in, first-out method. b. first-in, first-out method. c. specific identification method. d. average cost method.
Answers: 3
You know the right answer?
A borrower expresses concern that once he signs all the documents he will be "stuck" with a second m...
Questions
question
History, 04.12.2020 04:40
question
SAT, 04.12.2020 04:40
question
Health, 04.12.2020 04:40
question
Computers and Technology, 04.12.2020 04:40