Answers: 1
Business, 22.06.2019 07:20
Richardson hired j.c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j.c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
Business, 22.06.2019 10:00
Marco works in the marketing department of a luxury fashion brand. he is making a presentation on the success of a recent marketing campaign that included a fashion show. which slide elements can he use to include photographs and footage of the fashion show in his presentation? marco can use the: table images audio option to include photographs and the: flowcharts images video option to include footage of the fashion show.
Answers: 1
Business, 22.06.2019 18:00
What would not cause duff beer’s production possibilities curve to expand in the short run? a. improved manufacturing technology b. additional resources c. increased demand
Answers: 1
Business, 22.06.2019 21:50
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
Club Med Inc. talks to its present and potential customers to assess their needs for its products. T...
Mathematics, 07.07.2019 15:00
Biology, 07.07.2019 15:00
Computers and Technology, 07.07.2019 15:00
English, 07.07.2019 15:00
Biology, 07.07.2019 15:00