subject
Business, 25.06.2020 04:01 erinkiing

Kruger Designs hired a consulting firm 3 months ago to redesign the information system that the architects use. The architects will be able to use state of the art computer- aided design (CAD) programs to help in designing the products. Further, they will be able to store these designs on a network server where they and other architects may be able to call them back up for future designs with similar components. The consulting firm has been instructed to develop the system without disrupting the architects. In fact, top management believes that the best route is to develop the system and then to introduce it to the architects during a training session. Management does not want the architects to spend precious billable hours guessing about the new system or putting work off until the new system is working. Thus, the consultants are operating in a back room under a shroud of secrecy. Required:
a. Do you think that management is taking the best course of action for the announcement of the new system?Why?
b. Do you approve of the development process? Why?

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 21:30
Problem 2-18 job-order costing for a service company [lo2-1, lo2-2, lo2-3]speedy auto repairs uses a job-order costing system. the company's direct materials consist of replacement parts installed in customer vehicles, and its direct labor consists of the mechanics' hourly wages. speedy's overhead costs include various items, such as the shop manager's salary, depreciation of equipment, utilities, insurance, and magazine subscriptions and refreshments for the waiting room. the company applies all of its overhead costs to jobs based on direct labor-hours. at the beginning of the year, it made the following estimates: direct labor-hours required to support estimated output 10,000fixed overhead cost $ 90,000variable overhead cost per direct labor-hour $ 1.00 required: 1. compute the predetermined overhead rate.2. during the year, mr. wilkes brought in his vehicle to replace his brakes, spark plugs, and tires. the following information was available with respect to his job: direct materials $ 600direct labor cost $ 180direct labor-hours used 2 compute mr. wilkes' total job cost. 3. if speedy establishes its selling prices using a markup percentage of 30% of its total job cost, then how much would it have charged mr. wilkes?
Answers: 1
question
Business, 22.06.2019 03:30
Acrosswalk_when there are no pavement markings.
Answers: 1
question
Business, 22.06.2019 10:30
Which maxim is being neglected in the following conversation? eli: how did you do at the track meet? caleb: i came in second place! eli: congratulations! what was your time? caleb: six minutes, four seconds. the guy who won only beat me by three seconds. eli: really? katie said the winning time was under 6 minutes. caleb: oh, well, he might have beat me by five seconds. a)maxim of quantity b)maxim of quality c)maxim of relevance d)maxim of manner
Answers: 1
question
Business, 22.06.2019 19:20
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
You know the right answer?
Kruger Designs hired a consulting firm 3 months ago to redesign the information system that the arch...
Questions
question
Biology, 22.04.2020 23:32
question
Physics, 22.04.2020 23:32
question
Mathematics, 22.04.2020 23:32