subject
Business, 20.06.2020 17:57 24jgrove

Toledo Plastics has developed a product which incorporates new features with a standard product design. A production prototype has been built and the Methods Department has developed a job design for the production of the new product. Elemental times were taken from the Standard Data System and then checked with a stop-watch study. Toledo Plastics runs one 8 hour shift per day, 5 days a week and provides workers a 90 minute daily allowance for personal time and other contingencies. Daily standards are calculated as the normal time for the job divided by 1 - % Allowance. Production workers earn $25.00 per hour.
Below is a summary of the methods Department’s stop-watch study.
Product #4356 150 cycles timed
Timed on 6-4-20 all time in seconds
Element Average Time (sec) Performance Rating
1 200 1.20
2 70 1.00
3 100 .90
4 200* .85
5 70 1.25
6 80 . 90
Three cycles thrown out of calculation due to machine slippage. Average based on 147 cycles.
A. Using the time study data collected, develop a standard time for this job. State the standard in parts per hour. (carry your answer out to two decimal places)
B. What is the current weekly nominal capacity for a production worker who works at 112% of standard with an average scrap rate of 2%.
C. Assuming there are 15 workers producing this product, what rate of efficiency must the workers average if they are to meet a weekly demand of 2,600 units given an average scrap rate is 5%?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 11:30
10.     lucy is catering an important luncheon and wants to make sure her bisque has the perfect consistency. for her bisque to turn out right, it should have the consistency of a. cold heavy cream. b. warm milk. c. foie gras. d. thick oatmeal. student d   incorrect
Answers: 2
question
Business, 22.06.2019 13:00
Dakota products has a production budget as follows: may, 16,000 units; june, 19,000 units; and july, 24,000 units. each unit requires 3 pounds of raw material and 2 direct labor hours. dakota desires to keep an inventory of 10% of the next month’s requirements on hand. on may, 1 there were 4,800 pounds of raw material in inventory. direct labor hours required in may would be:
Answers: 1
question
Business, 22.06.2019 16:50
Atrough in the business cycle occurs when
Answers: 1
question
Business, 22.06.2019 20:00
Later movers do not face: entrenched competitors. reduced uncertainty over technologies. high growth markets. lower market uncertainty.
Answers: 3
You know the right answer?
Toledo Plastics has developed a product which incorporates new features with a standard product desi...
Questions
question
Mathematics, 28.11.2020 01:00
question
History, 28.11.2020 01:00
question
Mathematics, 28.11.2020 01:00