subject
Business, 15.05.2020 03:57 ahnorthcutt4965

One risk associated with a joint venture is that .
Multiple Choice:
A) a joint venture reduces the chances of management conflict.
B) a firm that enters into a joint venture risks giving control of its technology to its partner.
C) in a joint venture, one firm owns 100 percent of the stock.
D) a joint venture gives one firm a tight control over operations.
E) there is a high risk of being subject to nationalization, compared to wholly owned subsidiaries.

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 21:00
Arriving and delivering a load of company executives for a business meeting at a destination far from home base requiring an overnight stay, a company’s pilot requested approval from the company finance office to pay to either have the company’s jet brought into the fbo's hangar overnight to protect it from a forecast snowfall or to have it de-iced by the fbo the following morning well-before scheduled departure. the company was under considerable financial pressure at the time, and the pilot’s requests were denied because of the cost. so, early the following morning, the pilot was up on the wing of the jet sweeping off an accumulation of snow and ice with a borrowed push broom in preparation for the scheduled departure with the executives, but slipped and fell to the ground, suffering a broken neck. the business was organized as a limited partnership, owned by 3 limited partners and one general partner. as a cost-saving measure, the company had dropped its workers’ compensation insurance before the accident. analyze the potential liability for the pilot’s injuries of each of the following, showing your reasoning clearly: the company the general partner the limited partners analyze how the outcome would have been different, if the business had been organized as a corporation and observed all of the formalities to legitimize its corporate status. analyze how the outcome would have been different, if the pilot had been covered by workers’ compensation insurance.
Answers: 3
question
Business, 22.06.2019 07:20
Richardson hired j.c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j.c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
question
Business, 22.06.2019 10:00
You are president of a large corporation. at a typical monthly meeting, each of your vice presidents gives standard area reports. in the past, these reports have been good, and the vps seem satisfied about their work. based on situational approach to leadership, which leadership style should you exhibit at the next meeting?
Answers: 2
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
One risk associated with a joint venture is that .
Multiple Choice:
A) a joint venture r...
Questions
question
Social Studies, 25.10.2020 14:00
question
Social Studies, 25.10.2020 14:00
question
Mathematics, 25.10.2020 14:00