An asphalt paving crew is used to pave a road 8,000 feet long. The road is 48 feet wide and the paving machine can pave a 12-foot-wide strip of road during each pass. The machine paves 13 lineal feet of 12-foot-wide road per minute. Two lifts of asphalt are needed to pave the road. After completing a pass, it takes the crew 15 minutes to turn the paving machine around and get ready for the next pass. The crew consists of a foreperson, seven operators, and one laborer. Using the system efficiency of 45 minutes per hour, determine the number of labor hours required to place 1 lineal foot of road 12 feet wide.

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 16:30
Achecklists should be based on past
Answers: 1
question
Business, 21.06.2019 21:00
Resources and capabilities, such as interpersonal relations among managers and a firm's culture, that may be costly to imitate because they are beyond the ability of firms to systematically manage and influence are referred to asanswers: socially complex.causally ambiguous.path dependent.the result of unique historical conditions.
Answers: 3
question
Business, 22.06.2019 11:30
You've arrived at the pecan shellers conference—your first networking opportunity. naturally, you're feeling nervous, but to avoid seeming insecure or uncertain, you've decided to a. speak a little louder than you would normally. b. talk on your cell phone as you walk around. c. hold an empowered image of yourself in your mind. d. square your shoulders before entering the room.
Answers: 2
question
Business, 22.06.2019 22:00
Acontinental polar air mass foms where
Answers: 1
You know the right answer?
An asphalt paving crew is used to pave a road 8,000 feet long. The road is 48 feet wide and the pavi...
Questions
question
Physics, 08.11.2020 18:40
question
Mathematics, 08.11.2020 18:40
question
Physics, 08.11.2020 18:40
question
Mathematics, 08.11.2020 18:40
question
Physics, 08.11.2020 18:50
question
Physics, 08.11.2020 18:50