subject
Business, 05.05.2020 03:59 boonkgang6821

Determine: (a) the required hourly production rate and (b) the cycle time for a manual assembly line that will be used to produce a product with a work content time of 75 min and an annual demand of 150,000 units, if the plant operates 50 wk/yr, 5 days/wk, and 8 hr/day. It is anticipated that the line efficiency will be 94%. (show all your work)

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 21:20
Abakery wants to determine how many trays of doughnuts it should prepare each day. demand is normal with a mean of 5 trays and standard deviation of 1 tray. if the owner wants a service level of at least 95%, how many trays should he prepare (rounded to the nearest whole tray)? assume doughnuts have no salvage value after the day is complete.
Answers: 2
question
Business, 22.06.2019 04:50
Neveready flashlights inc. needs $317,000 to take a cash discount of 3/15, net 70. a banker will loan the money for 55 days at an interest cost of $13,200. a. what is the effective rate on the bank loan? (use a 360-day year. do not round intermediate calculations. input your answer as a percent rounded to 2 decimal places.) b. how much would it cost (in percentage terms) if the firm did not take the cash discount but paid the bill in 70 days instead of 15 days? (use a 360-day year. do not round intermediate calculations. input your answer as a percent rounded to 2 decimal places.) c. should the firm borrow the money to take the discount? no yes d. if the banker requires a 20 percent compensating balance, how much must the firm borrow to end up with the $317,000? e-1. what would be the effective interest rate in part d if the interest charge for 55 days were $7,200?
Answers: 3
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
question
Business, 22.06.2019 20:20
You are the cfo of a u.s. firm whose wholly owned subsidiary in mexico manufactures component parts for your u.s. assembly operations. the subsidiary has been financed by bank borrowings in the united states. one of your analysts told you that the mexican peso is expected to depreciate by 30 percent against the dollar on the foreign exchange markets over the next year. what actions, if any, should you take
Answers: 2
You know the right answer?
Determine: (a) the required hourly production rate and (b) the cycle time for a manual assembly line...
Questions
question
Mathematics, 28.01.2021 02:50
question
History, 28.01.2021 02:50
question
Chemistry, 28.01.2021 02:50
question
Mathematics, 28.01.2021 02:50
question
Mathematics, 28.01.2021 02:50