Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs:
- Setup (1,000 setup hours) $118,000
- Production scheduling (400 batches) 60,000
- Production engineering (60 change orders) 150,000
- Supervision (2,000 direct labor hours) 46,000
- Machine maintenance (12,000 machine hours) 60,000
- Total activity costs $434,000
The following additional data were provided for Job 845:
- Direct materials costs $7,000
- Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours) $1,000
- Setup hours 5 hours
- Production scheduling 1 batch
- Machine hours used (25 Milling machine hours; 5 Finishing machine hours) 30 hours
- Production engineering 3 change orders
Required:
(a) Calculate the cost per unit of activity driver for each activity cost category.
(b) Calculate the cost of Job 845 using ABC to assign the overhead costs.
(c) Calculate the cost of Job 845 using the plant-wide overhead rate based on machine hours.
Answers: 1
Business, 22.06.2019 10:10
Ursus, inc., is considering a project that would have a five-year life and would require a $1,650,000 investment in equipment. at the end of five years, the project would terminate and the equipment would have no salvage value. the project would provide net operating income each year as follows (ignore income taxes.):
Answers: 1
Business, 22.06.2019 19:00
All of the following led to the collapse of the soviet economy except a. a lack of worker incentives. c. inadequate supply of consumer goods. b. a reliance on production quotas. d. the introduction of a market economy.
Answers: 1
Business, 23.06.2019 01:20
Which resource management task includes activating local resource requirements, if available? a. track and report b. mobilize c. order and acquire d. reimburse and restock
Answers: 1
Business, 23.06.2019 02:00
People-focused workplace (connect, perform) organizations are undergoing changes in response to more people-driven workforces. use your knowledge of bossless workplaces to identify each of he following characteristics as either a challenge or benefit to this new style of workplace. resource allocation decision making training costs
Answers: 2
Assume that manufacturing overhead for Goldratt Company consisted of the following activities and co...
Physics, 10.06.2020 04:57
History, 10.06.2020 04:57
Mathematics, 10.06.2020 04:57
Mathematics, 10.06.2020 04:57
Mathematics, 10.06.2020 04:57
Mathematics, 10.06.2020 04:57
Mathematics, 10.06.2020 04:57
Spanish, 10.06.2020 04:57