Photon Technologies, Inc., a manufacturer of batteries for mobile phones, signed a contract with a large electronics manufacturer to produce three models of lithium-ion battery packs for a new line of phones. The contract needs the following quantities to be finally produced:

Battery Pack Production Quantity
PT-100 200,000
PT-200 100,000
PT-300 150,000
Photon Technologies can manufacture the battery packs at manufacturing plants located in the Philippines and Mexico. The unit cost of the battery packs differs at the two plants because of differences in production equipment and wage rates. The unit costs for each battery pack at each manufacturing plant are as follows:

Plant
Product Philippines Mexico
PT-100 $0.95 $0.98
PT-200 $0.98 $1.06
PT-300 $1.34 $1.15
The PT-100 and PT-200 battery packs are produced using similar production equipment available at each of the plants. However, each plant has a limited capacity for the total number of PT-100 and PT-200 battery packs produced (combined). The combined PT-100 and PT-200 production capacities are 175,000 units at the Philippines plant and 160,000 units at the Mexico plant. The PT-300 production capacities are 75,000 units at the Philippines plant and 100,000 units at the Mexico plant. The cost of shipping from the Philippines plant is $0.21 per unit, and the cost of shipping from the Mexico plant is $0.08 per unit.

(a) Develop a linear program that Photon Technologies can use to determine how many units of each battery pack to produce at each plant to minimize the total cost (including both production and shipping costs) associated with the new contract. To deal with combining costs, first determine if one specific type of battery is produced and shipped from a specific plant, how much would be the total cost. Then proceed to the problem formulation below.
Let P1 = number of PT-100 battery packs produced at the Philippines plant
P2 = number of PT-200 battery packs produced at the Philippines plant
P3 = number of PT-300 battery packs produced at the Philippines plant
M1 = number of PT-100 battery packs produced at the Mexico plant
M2 = number of PT-200 battery packs produced at the Mexico plant
M3 = number of PT-300 battery packs produced at the Mexico plant

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 15:40
Nikolas works in a shoe store as a salesperson. a teenage boy comes in looking for comfortable sports shoes because he is going on a hike. he tells nikolas he wants shoes that have velcro straps. nikolas shows him a wide variety of velcro-strapped shoes, but the customer rejects them because they don't feel comfortable. he asks for sports shoes with laces instead. nikolas once again shows him a wide variety. the boy is once again not satisfied and asks to see the velcro-strapped shoes again. nikolas is irritated but doesn't show his annoyance. what customer service skill is nikolas showing? nikolas is a. meekness b. patience c. persistence
Answers: 1
question
Business, 22.06.2019 02:30
Based on the supply and demand theory, why do medical doctors earn higher wages than child-care workers?
Answers: 1
question
Business, 22.06.2019 06:30
If a seller prepaid the taxes of $4,400 and the closing is set for may 19, using the 12 month/30 day method what will the buyer owe the seller as prorated taxes?
Answers: 1
question
Business, 22.06.2019 11:00
Why does an organization prepare a balance sheet? a. to reveal what the organization owns and owes at a point in time b. to reveal how well the company utilizes its cash c. to calculate retained earnings for a given accounting period d. to calculate gross profit for a given accounting period
Answers: 1
You know the right answer?
Photon Technologies, Inc., a manufacturer of batteries for mobile phones, signed a contract with a l...
Questions
question
English, 25.01.2020 18:31