subject
Business, 16.04.2020 02:32 hinojosachristian1

Wavy Wood Works makes several types of wood bowls from coastal driftwood. To make a bowl, the first step is to clean the driftwood. Each piece of driftwood makes a single bowl. There is one cleaning machine. It takes 39 seconds to load each piece of wood, and the machine can hold up to 36 pieces. Once all of the pieces are loaded into the machine, it takes 40 minutes to clean the set (no matter the number of pieces in the set). Once the wood is cleaned, 13 skilled artisans carve the bowls; each one takes, on average, 104 minutes to produce each bowl. After carving, bowls are finished with a stain. It takes 29 seconds to load each bowl into the stain machine. The staining machine holds up to 37 bowls. Once all of the bowls are loaded, they are soaked for 83 minutes. After staining, bowls are unloaded onto drying racks. There is plenty of space on the drying racks. a. What is the maximum capacity (bowls per hour) of this process? b. Suppose Wavy wants to operate with the same number of bowls in each batch that is cleaned or stained. For example, if they clean in batches of 30, then they stain in batches of 30 as well What batch size(in bowls) minimizes their inventory while allowing the process to produce at the maximum flow rate?

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 02:30
Question 1 which of the following tasks use your roommate as a resource? choose all answers which apply. take order wash the mixer’s bowl and mix the dough spoon cookies onto the tray unload the cookies from the oven pack the cookies 1 points question 2 which of the following tasks use the tray(s) as a resource? choose all answers which apply. take order wash the mixer’s bowl and mix the dough bake the cookies cool the cookies accept payment 1 points question 3 determine the task time for the following tasks. fill integer numbers into the blank (e.g., 5 rather than 5.0) wash and mixing the dough: minute(s)/order spoon cookies onto the tray: minute(s)/order set up timer: minute(s)/order bake: minute(s)/order cool the cookies: minute(s)/order pack the cookies: minute(s)/order accept payment: minute(s)/order 2 points question 4 q4: determine the cycle time for the following resources. fill integer numbers into the blank (e.g., 5 rather than 5.0) kristen (you): minute(s) roommate: minute(s) oven: minute(s) 2 points question 5 what is the capacity rate (in orders/hour) of the roommate? 1 points question 6 what is the capacity rate (in orders/hour) of the whole process? 2 points question 7 how long (in minutes) it takes to process the first order?
Answers: 3
question
Business, 22.06.2019 06:30
If the findings and the results are not presented properly, the research completed was a waste of time and money. true false
Answers: 1
question
Business, 22.06.2019 07:30
Net income and owner's equity for four businesses four different proprietorships, jupiter, mars, saturn, and venus, show the same balance sheet data at the beginning and end of a year. these data, exclusive of the amount of owner's equity, are summarized as follows: total assets total liabilities beginning of the year $550,000 $215,000 end of the year 844,000 320,000 on the basis of the preceding data and the following additional information for the year, determine the net income (or loss) of each company for the year. (hint: first determine the amount of increase or decrease in owner's equity during the year.) jupiter: the owner had made no additional investments in the business and had made no withdrawals from the business. mars: the owner had made no additional investments in the business but had withdrawn $36,000. saturn: the owner had made an additional investment of $60,000 but had made no withdrawals. venus: the owner had made an additional investment of $60,000 and had withdrawn $36,000. jupiter net income $ mars net income $ saturn net income $ venus net income $
Answers: 3
question
Business, 22.06.2019 14:20
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
You know the right answer?
Wavy Wood Works makes several types of wood bowls from coastal driftwood. To make a bowl, the first...
Questions
question
Mathematics, 12.03.2020 02:11