A machine makes two components; call them types A and B. It takes 490 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 seconds to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 2 seconds, or 30 units per minute.
For questions below, round answers to the nearest whole number:

(a) Suppose the machine rotates between one batch of 500 units of A and 500 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B?
(b) Suppose the machine rotates between one batch of 500 units of A and 500 units of B. What is the utilization of the machine?
(c) Suppose the machine rotates between one batch of 500 units of A and 500 units of B. What is the average inventory of B components?
(d) If the production schedule could be adjusted with the goal of minimizing inventory in the process, how many units of A should be produced before switching to component B? Assume the same number of units of B would be produced as well.

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 16:00
Excellent inc. had a per-unit conversion cost of $3.00 during april and incurred direct materials cost of $112,000, direct labor costs of $84,000, and manufacturing overhead costs of $50,400 during the month. how many units did it manufacture during the month? a. 18,000 b. 44,800 c. 70,000 d. 30,000
Answers: 1
question
Business, 21.06.2019 22:30
Acompany determined that the budgeted cost of producing a product is $30 per unit. on june 1, there were 80,000 units on hand, the sales department budgeted sales of 300,000 units in june, and the company desires to have 120,000 units on hand on june 30. the budgeted cost of goods sold for june would be
Answers: 1
question
Business, 22.06.2019 03:10
Jackson is preparing for his hearing before the federal communications commission (fcc) involving a complaint that was filed against him by the fcc regarding the interruption of radio frequency. the order to "cease and desist" using the radio frequency has had a detrimental impact on his business. once the administrative law judge prepares his or her initial order, jackson has no further options. no, jackson can request that the matter be reviewed by an agency board or commission. yes, once the initial order is presented, it's only a matter of time before the order becomes final.
Answers: 3
question
Business, 23.06.2019 01:00
Jimmy's delicatessen sells large tins of tom tucker's toffee. the deli uses a periodic review system, checking inventory levels every 88 days, at which time an order is placed for more tins. order lead time is 22 days. daily demand is a constant 1515 tins, so average demand during the reorder period and order lead time (1010 days) is 150150 tins. draw a sawtooth diagram. assume that the beginning inventory level is equal to the restocking level and the desired service level is 99.9%. what is the safety stock level? (hint: look at the formula for calculating restocking level.) what is the average inventory level? the safety stock level is average inventory level is __chart: time (10,20,30), tins (0,150) lines touching both axisthe safety stock level is 0 tinsthe average inventory level is 75 tins
Answers: 2
You know the right answer?
A machine makes two components; call them types A and B. It takes 490 seconds to switch production b...
Questions
question
History, 05.05.2020 16:57
question
Arts, 05.05.2020 16:57
question
Mathematics, 05.05.2020 16:57