subject
Business, 14.04.2020 21:03 ljcervantes6610

A lean system has the following characteristics: demand rate = 40 parts per hour; safety stock required = 10%; the container size = 8; lead time to replenish an order = 4 hours. If the number of containers is reduced by 2 units, what would be the new required round-trip time, all else being constant?

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 16:00
Suppose matt and bree go out to get pizza. they order breadsticks and a large pepperoni pizza. after eating the breadsticks, and one piece of pizza bree decides to have an additional piece, but she does not eat a third piece. if bree is a rational individual why did she not eat the third piece of pizza? the marginal cost of the
Answers: 2
question
Business, 21.06.2019 21:10
Auniversity spent $1.8 million to install solar panels atop a parking garage. these panels will have a capacity of 400 kilowatts (kw) and have a life expectancy of 20 years. suppose that the discount rate is 20%, that electricity can be purchased at $0.10 per kilowatt-hour (kwh), and that the marginal cost of electricity production using the solar panels is zero. hint: it may be easier to think of the present value of operating the solar panels for 1 hour per year first. approximately how many hours per year will the solar panels need to operate to enable this project to break even? a. a.3,696.48 b.14,785.92 c.9,241.20 if the solar panels can operate only for 8,317 hours a year at maximum, the project (would/would not)break even?
Answers: 1
question
Business, 22.06.2019 21:40
Which of the following is one of the main causes of inflation? a. wages drop so workers have to spend a higher percentage of income on necessities. b. demand drops and forces producers to charge more to meet their costs. c. rising unemployment cuts into national income. d. consumers demand goods faster than they can be supplied.
Answers: 3
question
Business, 22.06.2019 21:50
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
You know the right answer?
A lean system has the following characteristics: demand rate = 40 parts per hour; safety stock requi...
Questions