A laundromat has 5 washing machines. A typical machine breaks down once every 5 days. A repairer can repair a machine in an average of 2.5 days. Currently, three repairers are on duty. The owner of the laundromat has the option of replacing them with a superworker, who can repair a machine in an average of 5/6 days. The salary of the superworker equals the pay of the three regular employees. Breakdown and service times are exponential.
Should the laundromat replace the three repairers with the superworker?

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 04:50
Allie and sarah decided that they want to purchase renters insurance for the apartment they share. they made a list of all of the items to be covered by the insurance policy, along with their estimated values. if the items to be covered total more than $3000, the insurance company charges an annual premium of 23% of the total value of the items. if the items to be covered total $3000 or less, the insurance company charges an annual premium of 20% of the total value of the items.
Answers: 1
question
Business, 22.06.2019 21:00
At present, the united states has an embargo against north korea because a. the two countries have extremely poor political relations. b. north korea will not adopt a capitalist government. c. north korean products are too difficult to use. d. north korea has an embargo on american products. e. products from north korea are in higher demand than american-made products.
Answers: 2
question
Business, 22.06.2019 21:50
Q3. loral corporation manufactures parts for an aircraft company. it uses a computerized numerical controlled (cnc) machining center to produce a specific part that has a design (nominal) target of 1.275 inches with tolerances of ± 0.020 inch. the cnc process that manufactures these parts has a mean of 1.285 inches and a standard deviation of 0.005 inch. compute the process capability ratio and process capability index, and comment on the overall capability of the process to meet the design specifications.
Answers: 1
question
Business, 23.06.2019 00:50
Aproduction department's output for the most recent month consisted of 8,000 units completed and transferred to the next stage of production and 5,000 units in ending work in process inventory. the units in ending work in process inventory were 50% complete with respect to both direct materials and conversion costs. calculate the equivalent units of production for the month, assuming the company uses the weighted average method.
Answers: 3
You know the right answer?
A laundromat has 5 washing machines. A typical machine breaks down once every 5 days. A repairer can...
Questions
question
History, 02.11.2020 04:40
question
Mathematics, 02.11.2020 04:40