A production line is to be designed for a job with four tasks. The task times are 2.4 minutes, 0.4 minutes, 0.9 minutes, and 2.7 minutes. After line balancing, the largest possible assigned cycle time is minutes, and the smallest possible assigned cycle time is minutes.

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 20:30
Which of the following best describes a fractional reserve banking system? a. a banking system in which a large portion of the bank's assets are digital money rather than bills and coins. b. a banking system in which banks keep a portion of deposits on hand to satisfy their customer's demands for withdrawals. c. a banking system in which banks have only partial control over the interest rates they charge on loans. d. a banking system in which net worth is calculated by subtracting a fraction of liabilities from assets. 2b2t
Answers: 3
question
Business, 23.06.2019 00:10
You are to receive five gold coins from your great uncle as an incentive to study hard. the coins were originally purchased in 1982. your great uncle will deliver the coins the week after finals (assuming your grades are "acceptable"). the amount your great uncle paid for the coins is a(n): indirect cost.overhead cost.opportunity cost.sunk cost.
Answers: 1
question
Business, 23.06.2019 09:40
Max wants to open a basic checking account at his local bank. he needs to bring his and , along with a $50 deposit, to open the account.
Answers: 3
question
Business, 23.06.2019 11:20
In a hypothetical economy, a market basket consists of one laptop and two dvd players. in the base year, 2010, the price of a dvd player was $200, and the price of a laptop was $500. in 2015, the price of a dvd player was $380, and the price of a laptop was $750. the cpi for 2010 was
Answers: 3
You know the right answer?
A production line is to be designed for a job with four tasks. The task times are 2.4 minutes, 0.4 m...
Questions
question
Mathematics, 26.08.2021 17:30