An automobile final assembly plant is being planned for an annual production of 150,000 cars. The plant will operate one shift, 250 days per year, but the duration of the shift (hr/shift) is to be determined. The plant will be divided into three departments: (1) body shop, (2) paint shop, and (c) general assembly. The body shop welds the car bodies, and the paint shop coats the welded car bodies. Both of these departments are highly automated. The general assembly department has no automation, but a moving conveyor is used to transport the cars through the manual workstations. A total of 14.0 hours of direct labor (work content time) are accomplished in general assembly. Based on previous lines installed by the company, it is anticipated that the following design parameters will apply to the general assembly department:line efficiency = 95%, balance efficiency = 94%, repositioning time = 0.10 min, and manning level = 2.5. If the plant must produce 60 cars per hour, determine the following for the general assembly department: (a) The number of hours the shift must operate.(b) The number of workers required.(c) The number of workstations.
Answers: 1
Business, 22.06.2019 17:30
Fabian got into an accident on his way to work. he had multiple fractures in his leg. his doctor advised strict bed rest for at least three months.fabian is a freelance wildlife photographer who usually works on a contract basis, and this is his primary source of income. before the accident, fabian was planning his finances. which goal of his financial plan would fabian in getting through without pay for the next three months? the goal that requires the creation of a/an would fabian get through the next three months without pay.
Answers: 1
Business, 22.06.2019 21:20
Rediger inc., a manufacturing corporation, has provided the following data for the month of june. the balance in the work in process inventory account was $28,000 at the beginning of the month and $20,000 at the end of the month. during the month, the corporation incurred direct materials cost of $56,200 and direct labor cost of $29,800. the actual manufacturing overhead cost incurred was $53,600. the manufacturing overhead cost applied to work in process was $52,200. the cost of goods manufactured for june was:
Answers: 2
Business, 23.06.2019 02:20
Which one of the following is not a typical current liability? a. interest payable b. current maturities of long-term debt c. salaries payable d. mortgages payable
Answers: 3
An automobile final assembly plant is being planned for an annual production of 150,000 cars. The pl...
English, 13.02.2022 19:30
Mathematics, 13.02.2022 19:30
Mathematics, 13.02.2022 19:40
Advanced Placement (AP), 13.02.2022 19:40
Arts, 13.02.2022 19:40
Mathematics, 13.02.2022 19:40
Mathematics, 13.02.2022 19:40
Mathematics, 13.02.2022 19:40
Mathematics, 13.02.2022 19:40
Mathematics, 13.02.2022 19:40
Mathematics, 13.02.2022 19:40